After years of annually applying a standard epoxy to the inside of a heat exchanger water box, a power plant in Thailand seek a longer lasting method for corrosion protection
Tag: Liquid Metal
Case Study: Corroded 30-Metre Section of Sewer Force Main In Underground Vault Repair
An engineering company in Hawaii refurbish a 30-metre section of corroded 450mm ductile iron sewer main inside a vault after a previous repair attempt left a 30mm hole in the pipe
Case Study: Luxury Portable Toilet Trailer Leaking Wastewater Holding Tank Repair
Wastewater holding tanks underneath two luxury portable toilet trailers undergo repair and strengthening after heavy corrosion weakened and breached the metalwork
Case Study: Repair of Leaking & Corroded Shared Water Supply Pipe Connected to Eight Cottages
Four cottages in a terrace of eight repair their respective sections of a leaking and corroded 48 metre long shared water supply pipe attached to the back wall of the properties
Case Study: Corrosion Protection of 600mm Ductile Pipe & Outlets in Underground Pumping Station
Corrosion protection measures are made to a ductile pipe system including three outlets and six flanges in an underground pumping station operated by a UK water company
Case Study: 3 Metre Section of Corroded Steel Gas Pipe in CHP System Repair & Refurbishment
A pipe carrying natural gas in a combined heat and power system is refurbished after water trapped between the line and a badly installed PVC tape caused heavy corrosion
Case Study: Pipe Capping of Decommissioned Underground Drainage System at Landfill Site
A landfill site in Wales encapsulates a pipe stub and flange plate after capping to ensure a decommissioned drainage system could not release toxic leachate into the environment
Case Study: Permanent Anti Slip Solution to Protect Workers When Standing on Helicopter Skids
The Puerto Rico Power Authority create permanent anti slip surfaces for the legs of helicopters in their fleet on which workers stand during repair and maintenance of equipment
Case Study: Repair & Refurbishment of Corroded 20 Metre Long Porth Pipe Bridge
A dilapidated, corrosion-covered 300mm steel pipe crossing a 20 metre bridge over the Rhonda River is repaired and refurbished at a fraction of the cost of replacement
Case Study: Liquid Metal Lays Anti Slip Flooring Surfaces at PepsiCo Plant in Chile
12 different areas of an industrial plant operated by PepsiCo in Chile are given new anti slip surfaces in a cost effective application using Liquid Metal and silicon carbide grit